[SMM Weekly Review] 6.27-7.93, Weekly Price Trend Analysis of ESS DC-side Battery Cabin

Published: Jul 3, 2025 18:26
This week, the price of DC-side battery cabins slightly decreased. The average price of a 5 MWh DC-side battery cabin was 0.428 yuan/Wh, while the average price of a 3.44/3.77 MWh DC-side battery cabin was 0.437 yuan/Wh.

This week, the price of DC-side battery cabins slightly decreased. The average price for a 5MWh DC-side battery cabin was 0.428 yuan/Wh, while the average price for 3.44/3.77MWh DC-side battery cabins was 0.437 yuan/Wh. Stimulated by subsidy policies introduced in some provinces and cities, energy storage integrators have seen an increase in shipments of energy storage systems in those regions. However, property owners are still hesitant due to the incomplete implementation of detailed power mechanisms in various provinces. Integrators have slightly reduced product prices to compete for existing orders in the market. SMM predicts that the price of DC-side battery cabins may continue to decline slightly in the short term.

 

On June 30th, the bid winner for the energy storage system equipment procurement of the 2 million kW "Power Transmission from Alxa to Urumqi" Regional Mutual Aid New Energy Project was announced. The project is planned to be constructed in the Alxa League High-tech Industrial Development Zone, Inner Mongolia Autonomous Region, with a total capacity of 300MW/600MWh. The bid winner offered a price of 276 million yuan, which translates to a winning bid unit price of 0.46 yuan/Wh after conversion.

SMM New Energy Industry Research Department

Wang Cong 021-51666838

Yu Xiaodan 021-20707870

Ma Rui 021-51595780

Xu Ying 021-51666707

Feng Disheng 021-51666714

Liu Yujun 021-20707895

Lv Yanlin 021-20707875

Zhou Zhicheng 021-51666711

Zhang Haohan 021-51666752

Wang Zihan 021-51666914

Ren Xiaoxuan 021-20707866

Liang Yushuo 021-20707892

Wang Jie 021-51595902

Xu Yang 021-51666760

Chen Bolin 021-51666836

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
10 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
10 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
10 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
10 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
10 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
10 hours ago